PROJECTS
- examples of implemented constructions -
850 m³/h boiler feed water
FOR A SULFURIC ACID PRODUCTION IN SAUDI ARABIA
Complete demineralized water (conductance < 0,08 µS/cm) for world's
largest sulfuric acid production. The complete installation could be carried out in stainless steel, because of regeneration with sulfuric acid. Installation incl. chemicals inventory, redundant regulations and 2 x 5000 m³storage capacity.
Container system for a power station
SIWAbox - DEMINERALIZED WATER MOBILE AND CHEMICAL FREE
The Container system consists of 2 connected Containers for boiler feed water production with 2 x 9 m³/h for a biomass-power-station. Chemical free overhaul by reverse osmosis, membrane degassing, and EDI. Additional delivery and installation of storage tanks and a pump container.
Membrane degassing SIWA-02 90m³/h
OXYGEN REMOVAL FOR PETROCHEMISTRY
Hydrogen for the petrochemistry - desalinated, but not oxygen free, water was available at the location. As an alternative to a chemical
degassing, a membrane degassing installation was installed. Size ratio and energy demand are obvious favorable.
Boiler feed water treatment
TURN KEY PROJECT WITH ION-EXCHANGER
We established a complete boiler-feed-water-treatment (with a performance of 150
m³/h water from the cooling tower and 60 m³/h demineralized water inclusive constructing of the building and connection to the existing Building) for the power supply of a refinery location